The screw and barrel is an important part of the plastic extrusion blow molding machine. The normal cooperation of the screw and barrel ensures the continuous molding and production of the plastic extrusion blow molding machine. The disassembly of the screw barrel is a necessary step in the use of the blow molding machine. Today, Xiaobian brings you how to disassemble the screw barrel of the plastic extrusion blow molding machine.
 
1. Heat the connection between the screw of the blow molding machine and the head of the accumulator, and the temperature needs to be higher than the normal processing temperature. The purpose of this is to extrude all the plastic raw materials in the barrel.
Then disassemble according to the sequence of bolts at the connection, heater and wiring, cooling water pipeline of feeding section, automatic feeding device, extruder motor and wiring.

2. Loosen the fastening bolts connecting the feeding section, remove the coupling of the gearbox and the connecting bolts with the frame of the equipment, and move the gearbox back. Due to the heavy weight of the gearbox, it can be operated with a hydraulic jack. disengage it from the screw.
After the screw is tightly connected with the connecting sleeve, during the ejection process, a special screw removal tool can be installed on the other side of the connecting screw head of the reducer to eject the screw; when the connecting sleeve of the reducer is released from the screw, the screw can be removed The gearbox is lifted off the equipment rack.

3. Hoist the screw and the barrel together smoothly. For the large screw, the lifting of the barrel can be hoisted smoothly by the combination of the crane and the driving in the workshop. When lifting, pay attention to the coordination of each other's movements.

4. Warm up the hoisted barrel, and remove the relevant connecting parts and screws. Under normal circumstances, most of the blow molding machine manufacturers use replacement parts for repair, and the prepared spare screw and barrel can be installed after the relevant connecting parts are installed and then ready for hoisting.
 
This is how to disassemble the screw and barrel of the plastic extrusion blow molding machine. The following precautions also need to be paid attention to during the operation.

Due to the heavy weight of the screw and barrel of some large and medium-sized blow molding machines, if the crane lifting weight of the blow molding machine manufacturer cannot meet the requirements, the equipment parts can be hoisted by the combined operation of the vehicle and the crane.
When hoisting, pay special attention to the stability of the equipment parts, and the hoisting speed should not be too fast; the objects used for hoisting should be reliable.
When hoisting, a special person needs to command and coordinate the speed of the driving and the crane to ensure the smooth hoisting of the equipment parts. 
Items used for hoisting, such as wire ropes, rings, etc., cannot slide with the hoisted parts, and the connection must be reliable.
Operators and other on-site personnel cannot stand under the suspended objects and cranes to prevent accidents.